Refurbishment
Player Street
Nottingham
Refurbishment project at Player Street in Nottingham completed within the allocated time to be ready for letting.
Contractors
- Painter
- Carpenter
- Plumber
- Tiler
Milestones
- Removal & Cleaning
- New Bathroom and Tiling
- Painting
- Cleaning
- Carpeting
Planning Process
The flat required extensive renovation. However, a small workable budget was allocated as the property was to be sold on.
Time Management
We allocated approximately 30 days to complete the project. This was determined by the sum of all contractor’s maximum estimates.
Materials Research
To ensure prompt completion and correct materials, we did materials research to match the allocated budget.
Clearing Out
Booked in removal and disposal team to clear out the flat.
Contractor Management
The schedule was tight, hence we ensured all contractors were allocated a specific time to start and end, minimizing overlap.
Features
Key features for this project was to create a an easy to maintain and durable kitchen and bathroom
Minimal Design
Modern bathroom and shower
Durable modern carpets
Layout Planning
Planning the final efficient layout of the interior of the flat to minimise wastage in materials and get accurate quotes.
Bathroom
A key selling point and feature of the renovation. Getting design and layout of the bathroom in keeping with the modern easy to maintain theme
Kitchen
Kitchen is part of the open plan living of this flat. But it was in bad disrepair. A revamped kitchen reusing existing frames to minimise costs.
The numbers
Days to complete
Contractors
Cost (£)