Refurbishment

Player Street
Nottingham

Refurbishment project at Player Street in Nottingham completed within the allocated time to be ready for letting.

Contractors

  • Painter
  • Carpenter
  • Plumber
  • Tiler

Milestones

  • Removal & Cleaning
  • New Bathroom and Tiling
  • Painting
  • Cleaning
  • Carpeting 

Planning Process

The flat required extensive renovation. However, a small workable budget was allocated as the property was to be sold on.

Time Management

We allocated approximately 30 days to complete the project. This was determined by the sum of all contractor’s maximum estimates.

Materials Research

To ensure prompt completion and correct materials, we did materials research to match the allocated budget.

Clearing Out

Booked in removal and disposal team to clear out the flat.

Contractor Management

The schedule was tight, hence we ensured all contractors were allocated a specific time to start and end, minimizing overlap.

Features

Key features for this project was to create a an easy to maintain and durable kitchen and bathroom

b

Minimal Design

Modern bathroom and shower

Durable modern carpets

Layout Planning

Planning the final efficient layout of the interior of the flat to minimise wastage in materials and get accurate quotes.

Bathroom

A key selling point and feature of the renovation. Getting design and layout of the bathroom in keeping with the modern easy to maintain theme

Kitchen

Kitchen is part of the open plan living of this flat. But it was in bad disrepair. A revamped kitchen reusing existing frames to minimise costs.

The numbers

Days to complete

Contractors

Cost (£)

Before pictures and media

Other Recent Works